Why an as-built drawing differs from a design drawing
Approved changes can move connection points during construction. Keeping only the original design makes later maintenance harder.

What we consider
Record installed pipe, cable and maintenance positions in as-built documents. Preserve reasons, dates and approvals for changes. Link selected photographs of concealed work to room names, while recognising that photos do not replace dimensioned drawings. Give the clinic's responsible person a clearly organised final package.
Keep the installed arrangement
A route changed slightly during installation makes the original design insufficient for later work. Do not leave the change only in memory or a chat. Check actual service positions before drilling a wall.
Record the decision
Link as-built diagrams, concealed-work photographs and approval records together.
A practical next step
Include as-built drawings and system documentation in the handover checklist.
- Record changes
- Link records to rooms
- Obtain the final issue