Construction sequence: an early start is not always the fastest route
Early finishing can show quick progress, only to be damaged by later engineering work. The programme must follow dependencies.

What we consider
Define entry conditions for each stage: which systems must be tested and documents approved before covering a surface? Coordinate delivery, process durations, furniture measurement and installation with manufacturer instructions. A deadline alone does not reveal delay causes. Track tasks that most affect subsequent work.
Work that must precede finishing
An engineering change after ceiling closure may require reopening it. Review the programme by task as well as by room. Agree which inspection permits the next stage to begin.
Record the decision
Record the entry condition and completed deliverable for every stage.
A practical next step
Show each task, its prerequisite and the next acceptance checkpoint in three columns.
- Record dependencies
- Link deliveries
- Set checkpoints