Test concealed services before closing them in
Pipes and cables become harder to access behind finishes. Schedule required inspections in advance.

What we consider
The responsible engineer should define tests and records for each system. A verbal assurance from the builder cannot replace handover documentation. Record date, location, findings and responsibility. Photographs support evidence but do not replace technical tests. Allow correction and retesting before covering defects.
A hold point before covering
Defects become harder to find and repair after finishes conceal services. Schedule the work to be inspected, participants and required records. The relevant specialist defines the testing procedure.
Record the decision
Archive inspection records and reports with the corresponding room and drawing references.
A practical next step
Add pre-finishing checkpoints to the programme and identify who signs them off.
- List required checks
- Document results
- Cover only afterwards