Is the room ready for furniture installation?
An unready room increases moving and storage risks when furniture arrives. Include a readiness check in the programme.

What we consider
Verify final dimensions, wall and floor conditions, electrical points and access. Agree storage conditions with the manufacturer where wet work continues nearby. Prepare drawings and equipment information for installers. Allocate fixing and connection responsibilities to appropriate specialists in advance.
Measurement and installation are different stages
Changed floor or wall thickness after measurement can make completed furniture misfit. Confirm final levels with the manufacturer. Plan delivery, storage and protection of finished surfaces for installation day.
Record the decision
Use separate readiness checklists for measurement and installation.
A practical next step
Inspect readiness with the furniture maker and site supervisor before delivery.
- Confirm dimensions
- Check connections
- Prepare access