A material record remains useful after renovation
After construction, it can be difficult to identify the paint, tiles or hardware used. A material record keeps the information together.

What we consider
Record manufacturer, code, colour, supplier and room for every product. Attach care instructions and purchase documents. Dimensions and specifications help find alternatives if a model is discontinued later. Record where spare materials are kept; an unlabelled box is not a long-term system.
Information for future maintenance
If part of a wall needs repainting a year later, 'light beige' is insufficient. A code, manufacturer, batch and finish-system record makes a suitable match easier to find. Record the product actually purchased.
Record the decision
Include the supplier, care instructions and location of spare stock in the record.
A practical next step
Include a room-by-room material schedule and labelled samples in the handover folder.
- Keep product codes
- Link products to rooms
- Record care requirements

