A technical inspection before signing the lease
An expensive clinic-opening mistake often happens before finishing work starts: the premises' capabilities are investigated too late.

What we consider
The inspection should produce photographs, approximate measurements, a record of existing services and a list of unresolved questions. If the space above the ceiling or below the floor is unknown, do not present assumptions as facts. Review the owner's documents and use restrictions with the appropriate specialist. A designer's sketch cannot replace a technical inspection.
Present does not mean operational
A wall socket or ceiling grille does not establish that a system is suitable for the clinic. Request existing documentation and information on connections and maintenance. Anything an engineer has not checked belongs in the report as an unresolved issue, not a ready-to-use capability.
Record the decision
Keep the landlord's answers, inspection photographs and specialist conclusions in one folder.
A practical next step
Before deciding on the lease, compile the findings, further investigations and people responsible into one list.
- Photograph the existing condition
- Flag unknowns
- Assign responsibilities

