Electrical capacity: ask before signing a lease

Socket numbers do not establish a building's electrical capacity. Clinical equipment, lighting and other systems need assessment together.

LULuxury Uzbekistan editorial team
Architecture and interiors
A rendering from the Luxury Uzbekistan project archive
LU project archive · 3D rendering

What we consider

Request documents confirming allocated capacity and connections. Obtain electrical requirements from equipment suppliers. A qualified electrical engineer should assess simultaneous loads, backup power requirements and specialist protection measures. If capacity is inadequate, obtain a written assessment of feasibility, timing and cost instead of assuming it can be resolved later.

Use documented information

A verbal assurance that supply is 'enough' may not support a design. Request allocated-capacity and connection information. The electrical engineer should assess demand from the equipment schedule.

Record the decision

Identify insufficient or unconfirmed capacity as an unresolved issue in the estimate.

A practical next step

Give the electrical engineer building information and the proposed equipment list before deciding on the lease.