Review the design after demolition
Removing old finishes can reveal previously hidden pipes, unevenness or structure. Compare these findings with the initial assumptions.

What we consider
Add a post-demolition checkpoint to the programme. Check actual dimensions and systems against design information. Do not alter uncertain structural conditions without qualified assessment. Record differences with photographs and measurements, then update affected cost and programme assumptions.
Exposed conditions provide new information
Removing finishes may reveal a route or defect that was previously invisible. Consult the relevant specialist before automatically continuing the original plan. A finding does not immediately establish an extra cost; define the task and solution first.
Record the decision
Prepare a record with photographs, location and recommendations; incorporate approved changes into drawings and estimates.
A practical next step
Agree the revised condition with the relevant designers before the next concealed work begins.
- Measure again
- Record differences
- Approve the response

